Clean Management was engaged to assist in the environmental clean-up after the closure of a major fiberglass manufacturing facility. Our team coordinated with the client as well as local regulators to ensure that the environmental cleanup services tasks that were assigned to Clean Management were accomplished in accordance with their guidance. The following tasks were managed by Clean Management:

Disassembled the AES mist eliminator
Numbered, documented, cleaned, and shipped the AES mist eliminator to Mexico using six flatbed trailers
Removed piping and cleaned a tank farm consisting of twelve tanks with both hazardous and non-hazardous materials
Cut, resized, and shipped removed tanks ranging from 5,000 to 10,000 gallons to another facility
Cleaned the plant in readiness for re-sale